My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96956
DRMS
>
Back File Migration
>
Revision
>
REV96956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:28 AM
Creation date
11/22/2007 12:04:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Name
EXHIBIT 58 REVISED JUNE 13 1984
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised June 13, 1984 <br />Loader cost per pond = $92.82 x 34 = $3200/pond <br />$3200/pond x 6 ponds = S 19,200 <br />TOTAL Pond Removal Cost = $154,200 <br />Surveyors Cost <br />Assumptions: <br />1. It will take 5 days to level out dam <br />2. It will take 2 hrs/day for surveyor to monitor work ( 1 hour <br />in morning, 1 hour in afternoon) <br />3. 5 days/week x 2 hours/day = 10 hours per pond <br />4. 2 persons on survey crew at $45.00/hr* <br />5. 545.00/hr x 10 hrs/pond = $450/pond <br />$450/pond x 6 ponds = S 2,700 <br />*Per Rocky Mountain Surveyors, Oak Creek, Colorado. 1989 prices. <br />Smooth Grading Costs <br />Sedimentation Pond embankment areas are all less than 1.5 acres <br />each. Use 1.5 acres. <br />6 ponds x 1.5 acres each = 9 acres total <br />Cat 16G motor grader grades 1 acre per hour <br />Cat 16G motor grader costs $70.03 per hour <br />Srtiooth Grading Cost = 9 acres x 1 hr/acre x $70,03/hr = $ 600 <br />Topsoil Replacement <br />Embankment Areas <br />Assumptions: <br />1. 1.0 ft. of topsoil under each embankment <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.