Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />E. EARTHHORk - RIPPING <br />Task p~ 7aek Description <br />~ Rip compacted areas as follows: <br />16 ~ Nev Acc eas Rd Erom Hwy 133 to Sylvester Gulch Rd <br />17 ~ Sylvester Gulch Fan Pad and Road <br />18 ~ Stack Tubes and Reclaim System <br />19 ~ All surface facility area9 <br />20A ~ Light-Use and Aceea9 Roads (rID-2R 6 MB-7) <br />21 ~ Bear #1 Mine ]including road) <br />NA ~ Ripping topsoil included in Seedbed Preparation <br />Cost 151 <br />$120 <br />5150 <br />51,299 <br />52,598 <br />sz42 <br />$999 <br />64 ~ Rip exploration pad and toads ~ $776 <br />fi7 ~ Rip drill pad for water tank boreho les ~ 576 <br />72 ~ Rip 1.2 million gallon eater tank boreholes ~ $100 <br />53 ~ Rip storage bench access road (TTip671 ~ SBO <br />54 ~ Rip truck pull-out lane (TA#671 ~ S20 <br />55 ~ Rip portal access road (only portion E. of portals 5120 <br />57 ~ Rip materials storage bench ITR#67) ~ 5729 <br />59 ~ Rip Lone Pine Gulch Pan Pad i Staging Area ~ $602 <br />75 ~ Rip rd section to be reclaimed in Lone Pine ~ $110 <br />27] ~ Rip all SGPA disturbed areas ~ 55,408 <br />276 ~ Rip MA 212 devatering borehole pad ~ 5172 <br />Subtotal (SI: 513,199 <br />P. EARTHHORR - ROAD RECLAMATION <br />Task N~ <br />______ Task Description ~ <br />____________________________________________________I Cost ($) <br />____________ <br />I <br />~ Reclaim all cur and fill roads as follows ~ <br />22 ~ Haul/Access Rd from Office Bldg Co Portals ~ 52,767 <br />23 ~ S[acktube Access Road ~ 51,379 <br />24 ~ Middle-Nine Pacillt Les Road ~ 51,055 <br />26 ~ Ramp from Hwy 133 co Loadouc ~ 5251 <br />26 ~ Haul/Access Rd from Sly Gulch to Office BLd9 ~ 51,958 <br />26A ~ Push gravel from Lover Roads into MB-2R ~ 51,008 <br />2fiB ~ Pu9h Gravel from Lower Roads Into MB-3 ~ $507 <br />45 ~ Subscat ion Road ~ 516 <br />46 ~ Main Assess Road Co Substation ~ 51,139 <br />97 ~ Haul/Access Rd from Hry 177 to Sly 411th Rd ~ 54,272 <br />61 ~ Regrade drill roads ~ 5824 <br />99 ~ Backfill portal access road ~ 5],292 <br />56 ~ Backf ill storage bench access road (TTip67) ~ 5987 <br />B2 ~ Backfill rd Section to be reclaimed a Lone Pine ~ 5177 <br />79 ~ Recanatrvt[ rd thrv Lone Pine fan 6 staging area ~ 5173 <br />204 ~ MA-200; Regrade DMEA Povetllne Road ~ $423 <br />227 ~ Haul backfill for main access Sta. 60-78 ~ $74,705 <br />229 ~ Regrade SGFA lt. use roads ~ 541,699 <br />270 ~ Regrade main access rd Sta. 58-92 ~ $28,908 <br />231 ~ Regrade main toad Sta. 7-98 ~ $49.202 <br />272 ~ Regrade sober scion access road IPRB7) ~ $11.51] <br />Subtotal (FI: 5220,322 <br />sheet 3 of 10 <br />