Laserfiche WebLink
RECLAMATION COST SUMMARY cone d <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task p~ 7ask Description <br />NA ~ No Highwall Reducc ion Required <br />ADDITIONAL RIPPING WORK <br />145 ~ Rip Shaft p3 and roads <br />~ Cost 151 <br />~ Sl,Sls <br />Subtotal IB): 51,979 <br />C. EARTHWORK - WASTE/TAILINGS PILE CAPPING AND/OR COVER PLACEMENT <br />Task N~ Task Description ~ Cos[ ($) <br />NA ~ Upper Refuge Pile 19 no[ planted Eor permit term ~ <br />12 ~ Grade all ungraded refuse material ~ 557,000 <br />13 ~ Final shaping of Lower Refuge Pile ~ $27,918 <br />NA ~ Waste Pile cover completed in Task 40 ~ <br />NA ~ Compaction of refuge material included in Task 15 ~ <br />~ ~ <br />~ ~ <br />________________________________________________________________________ <br />Subtotal IC1: 584,518 <br />D. EARTRWOAK - PILL COMPACTION <br />Task p~ <br />______ <br />________ Task Description ~ <br />____________________________________________ <br />_ Cost 151 <br />__________ <br />15 ~ Compact I <br />graded refuge material ~ $3B, 176 <br />235 ~ Compact shaft backfill material ~ 56,942 <br />236 ~ Compact subscat ion backEill ~ $1,736 <br />277 ~ Compact light use road material ~ 57,957 <br />278 ~ Compact aubstat ion road material ~ $729 <br />239 COmpdCC mdln dCCe999 LOdd maC erldl $10,1$6 <br />117 ~ Compact re9idual coal on RPE ~ $1,975 <br />144 ~ Compact baekftlled material at Sha E[ Nl pad and road 519,945 <br />92g ~ Compact add'1 cut material at MSB ~ 51,831 <br />Subtotal (DI: 585,447 <br />sheet 2 of 10 <br />