Laserfiche WebLink
G. EAR77RiORK - FINISH GRADING <br />'Task p~ Task Description <br />_I __ ___________ <br />2] ~ Entire SackEilled area <br />ADDITIONAL ROAD RECLAMAT ZON <br />2I9 ~ Pu11 up material for light use road reclamac ion ~ <br />276 ~ Rip dewatering borehole road IMR 212) ~ <br />277 ~ Regrade " "^ ~ <br />281 ~ Remove roadbase on dews[. bh access rd (MR 212) ~ <br />107 ~ Rip RPE road <br />108 ~ Rip mine entrance expansion <br />109 ~ Regrade RPE road ~ <br />110 ~ Regrade mine entrance expansion area ~ <br />112 ~ Pull up material for RPE road reclamation <br />113 ~ Regrade NSS area entrance ~ <br />116 ~ Compact ROE road batkEill ~ <br />172 ~ Regrade MR 214 drill roads <br />154 ~ Regrade MR 218 borehole roads ~ <br />163 ~ Regrade road to tune Pine Gulch treatment pond <br />164 ~ Rip Load Co Lone Pine Gulch treatment pond <br />G09L 1$) <br />$9,999 <br />512,137 <br />557 <br />5681 <br />$91 <br />$127 <br />$207 <br />$4,008 <br />51,119 <br />$1,392 <br />$B9 <br />5355 <br />$916 <br />$9,737 <br />Subtotal (GI: "-""$:=:=::- <br />H. 6ARTRwORK - STREAM CHANNEL CONSTRUCTION/RECONSTRUCTION <br />Task p~ Taek Deacript ion ~ Cost ($) <br />__________________________________________________________I____-____. <br />NA ~ No Stream Channel Reconstruction is Required ~ <br /> ADDITIONAL ROAD RECLAMATION ~ <br />170 ~ Pull up add~l material on Sly Gulch It .use rd. ~ 52,192 <br />171 ~ Regrade add~l material on Sly Gulch lt .use rd. ~ $2,131 <br />172 ~ Compact add•1 ma[erlal on Sly Culch lt .use rd. ~ $693 <br />177 ~ Replace <br />~ <br />~ topsoil on Sly Gulch lt.uae rd . expansion a~ <br />~ <br />~ $769 <br /> <br /> <br />_____. ~ <br />~ <br />I________ <br /> <br />________________ <br /> <br />_____________ <br /> <br />__ ~ <br />~ <br />_____________I__ <br />Subtotal (H): <br /> <br />_________ <br />$5,365 <br />sheet 4 of 10 <br />