Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />P. MISCELLANEOUS RECLAMATION TASKS <br />Task <br />_____ q Task Description <br />_I____________________________________________________I Cost ($1 <br />____________ <br /> I Dredge Pond MB-4 12/yr)over 10-year $9,000 <br /> I liab¢lrcy period 4 pond ®5450 20 I <br /> I Source: Nest Elk I <br />208 Demolish Building Ad7a<ent to the RNIG Building $1,150 <br />300 Remove Lone Prne Gulch Discharge Pipe I $B.OSB <br />106 Remove RPE structures I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I 527,216 <br /> I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I ADDITIONAL STRUC[T1INL DEMOLITION TASI(S I <br />220 Remove Syl~escer Gulch Facllicies (PR07) I $1,114,262 <br />175 MR 214 etrll<ture9 I $3,]24 <br />141 I Shaft #3 structures (MR 216) $36,830 <br />476 I Aemove cul~ett C2-7A (MR 220) $1,775 <br />160 I Remove structures at Lone Pine Gulch treatment pond) <br />174 I Remove guardrail on widened Sly Culch lt.use rd. I 511,795 <br />183 I Demolish dozer service facility IMR 2291 I <br />I - <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I I <br />I I <br />I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I 531,769 <br />5ubcotal (PI: -$1-2a6i619• <br />sheet 9 of 10 <br />