Laserfiche WebLink
RECLAMATION COST SUNPIARY con['d <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through P): 58,939,071 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD L PROFIT <br />Item p~ <br />__-_-- Item Description <br />___________________________________ ~ <br />__________________ Cost I51 <br />___________ <br />I <br />1. ~ Public Liability Insurance..... 1. SSOt of direcC~ 5130,728 <br />2. ~ Cont ra etor's Performance Bond.. 0.975fi of direcc~ 582,232 <br />3. ~ Contractor's ProF it............ IO.OOt of direet~ 5893,407 <br />4. ~ Job Superint endenc.. ~ $193,699 <br />Subtotal IA1: 51,250.016 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 4 P1: 59,689.089• <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item p~ Item Deacxipt ion ~ Cost (51 <br />______ _______________________________ ____________ <br />1. ~ Project engineering fees at.... 4.251 of cnti. ~ 5411,574 <br />2. ~ StafE admin. expense 1.OOfi of cntr. ~ 596,841 <br />Subtotal IBI: SSOB,a15 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 51,758.431 <br />NET INDIRECT COST PERCENTAGE: 20.85fi <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIRECT coecsl: 510,192,509 <br />III. BOND STATUS -- BOND RELEASE SUMMARY <br />ghee[ 10 of 10 <br />