Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />M. REVEGETATION AND RESEEDING <br />Task p~ Task Description <br />63 ~ Revegecate drill pads and roads IMR 2191 <br />]6 ~ Mix pl - Drill Seed most areas of mine site <br />77 ~ Mix pl - Broadcast seed sma 11 areas <br />7B ~ Mix q1 - Hydroseed slopes 9reaced than 3:1 <br />79 ~ Mix p2 -Broadcast seed riparian areas <br />80 ~ Shrub Mix pi - in all areas except riparian zone <br />81 ~ Shrub Mix p2 - Riparian Zone <br />103 ~ Reseed Exploration road (I41p951 <br />302 ~ Reseed Lone Pine Gulch pipeline corridor IMR2091 <br />250 ~ Revegecate $GFA disturbance <br />210 ~ Revegecate RPE, road, mine ent ranee, and NSS Area <br />Cos[ (SI <br />510,2]0 <br />sa],o11 <br />516,335 <br />$53.250 <br />$286 <br />$190,999 <br />$1,fi24 <br />51,0]5 <br />$182 <br />$301,564 <br />$129,647 <br />Subtotal IM1: 5753,738 <br />N. STRUCRIRAL DEMOLITION S REMOVAL <br />Task p~ Task Description <br />-_----I-------~--__-----~-~~------------------------------- <br />47 ~ Demolish and remove all structures, equip., 6 mat. <br />93a ~ Demolish and remove all atzvotures, equip., 6 mat. <br />200 ~ MR-193; Remove drailuge aprons o Silo <br />201 ~ MR-192: Remove $t ructuree O Material Storage Bench <br />202 ~ MR-198; Bathhouse Expana ion Facility <br />203 ~ MR-199; 12,000 Gallon Tank <br />206 ~ MR-200; Remove DMEA Powerllne <br />207 ~ MR-203; S3 Jersey Barriers <br />C09C ($) <br />$2,996,910 <br />5689,207 <br />$1,634 <br />$65,191 <br />$13,89] <br />51,9]3 <br />5694 <br />57,91fi <br />Subtotal (N1: $3,]]2,922 <br />O. EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task p~ iask Deacript ion ~ Cos[ ($1 <br />44 ~ Haul equipmen[ co and Lrom job Site ~ 531,928 <br />BO ~ <br />~ <br />~ <br />~ Haul additional equipment for PR 07 work ~ 53,159 <br />~ <br />~ <br />~ <br />Subtotal (0I: 535,087 <br />sheet 8 of to <br />