My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96134
DRMS
>
Back File Migration
>
Revision
>
REV96134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:55 AM
Creation date
11/21/2007 11:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Revision
Doc Name
TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION OF STEGNER FARMS PIT SLURRY WALL LARIMER CNTY COLO
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DMSION 1 -GENERAL REQUIREMENTS <br />SECTION 01400 -QUALITY CONTROL <br />1.01 TESTING -GENERAL <br />The Contractor shall provide such equipment and facilities as the Engineer may require for conducting field <br />tests and for collecting and forwarding samples. Materials or equipment represented by samples shall not <br />be used until tesu, if required, have been made and the materials or equipment found to be acceptable. <br />Any product which becomes unfit for use after approval thereof shall not be incorporated into the work. <br />All materials or equipment proposed to be used may be tested at any time during their preparation or use. <br />The required samples shall be famished without chazge and sufficient notice given prior to the placing of <br />orders to permit the testing. Products may be sampled either prior to shipment or after being received at the <br />site of the work. <br />The following tesu shall be made by an accredited testing laboratory, selected by the Engineer and paid for <br />by the Owner. <br />A. Shiny and soil bentonite backfill tests shall be made at such times and in such numbers as <br />specified in Section 02168, Slurry Wall Conswction. <br />B. Fill <br />Control tests of fill material shall be made at such times and in such numbers as specified in <br />Section 02290, Fill Area Conswction. <br />Where additional or specific information concerning testing methods, sample sizes, etc., is required, such <br />information is included under the applicable sections of the Specifications. Any modification of, or <br />elaboration on, these test procedures which may be included for specific materials under their respective <br />sections in [he Specifications shall take precedence over these procedures. <br />I.02 OTHER TESTING <br />If required, the following testing shall be performed at the expense of the Contractor installing the material <br />being tested: <br />A. Material Substitution <br />Any tesu of basic material or fabrication equipment offered as a substitute for specified item on <br />which a test may be required in order to prove iu compliance with the Specifications. <br />B. Test Failure <br />Any test that fails shall be paid for by the Contractor subject to the following conditions: <br />Quantity and nature of tests will be determined by the Engineer. All tests shall be taken <br />in the presence of the Engineer or his representative. <br />2. Proof of noncompliance will make the Contractor liable for any corrective action which the <br />Engineer feels is prudent including complete removal and replacement of defective <br />material. <br />OI/99 Section OI400 - Page l of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.