Laserfiche WebLink
1 • • <br />DMSION t -GENERAL REQUIREMENTS <br />SECTION 01330 -SURVEY DATA <br />I.01 SURVEY REQUII2EMENTS <br />A. Construction Stakeout: <br />1. Perform construction stakeout with qualified, competent personnel. <br />2. Owner has established all temporary benchmarks as found on the Drawings. Base all <br />vertical measurements on established control. <br />3. Stake the slurry trench along its alignment a[ all beginning and ends of all curves and at <br />50-foot stations. <br />4. Enter all survey notes and construction stakeout cut notes into bound, hard cover field <br />books famished to Conuactor by Owner. <br />B. All sttrvey data developed by Contractor in performing surveys required by the Work will be <br />available to the Engineer for examination throughout the construction period. <br />1.02 SUBMITTALS <br />A. Submit a copy of the cut sheets to Resident Project Representatives aminimum of 36 hours in <br />advance of construction activities so that lines and grades may be checked prior to construction. <br />B. Submit to the Engineer all field books, notes, cut sheets and other data developed by [he <br />Contractor in performing surveys along with other documentation required for Final acceptance. <br />END OF SECTION <br />01/99 Section 01330 - Page I of I <br />