Laserfiche WebLink
o <br />Nothing contained herein is intended to imply that [he Contractor does not have [he right to have tests <br />performed on any material at any time for his own information and job control so long az the Engineer does <br />not assume responsibility for cosu or for giving them consideration when appraising quality of materials. <br />1.03 TEST REPORTS <br />Reporu of all tests made by testing laboratories shall be distributed by the testing laboratory as follows: <br />l copy -Contractor <br />1 copy -applicable supplier or Subcontractor <br />1 copy -Engineer <br />Other copies - az directed. <br />L04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and tesu <br />of all items of work, including that of Subcontractors, to insure conformance to the Contract <br />Documents for materials, workmanship, construction, finish, functional performance and <br />identification. This convol shall be established for all construction except where the Contract <br />Documents provide for specific compliance tests by testing laboratories or [he Engineer. The <br />Contractor's quality control system shall specifically include all testing required by the various <br />sections of the Specifications. <br />The Contractor's quality control system is the means by which he azsures himself that his <br />construction complies with the requirements of the Contract Documents. Controls shall be <br />adequate to cover all construction operations and shall be keyed to [he proposed construction <br />schedule. <br />EIYD OF SECTION <br />01/99 Section 01400 -Page 2 of Z <br />