My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95792
DRMS
>
Back File Migration
>
Revision
>
REV95792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:42 AM
Creation date
11/21/2007 11:52:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/19/1992
Doc Name
MR REQUEST 20 SOUTH FAN INSTALLATION
Type & Sequence
MR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SouthjicGr Mint Minor Revision Request No. 20 -South Fan lnstallatian • 16 <br />in the EFCI permit document. Areas inby the seal will be timbered, bolted, <br />backfilled or otherwise supported to prevent caving which could affect the <br />seal. An MSHA approved sealant will be used on the outer surface of the <br />seal to provide a barrier against water movement. <br />Following construction of the portal seal, the fan portal and fan installation <br />site will be backfilled and graded to provide a minimum of 4 feet of suitable <br />cover over any exposed coal seams or debris with maximum 3H;1 V slopes. <br />Required fill material will be obtained from the temporary stockpile <br />established during site clearing and grading. This material will be <br />supplemented, as neccessary, from an existing overburden stockpile created <br />when the Monarch No. 4 Mine portal bench was established. The location <br />of this supplemental borrow source is shown on the South Mine Fan <br />Installation Map, fMap 30). <br />• <br />Following removal of the temporary stockpile, this area and the <br />supplemental borrow area will also be graded to blend with the surrounding <br />terrain. Temporary drainage control ditches and berms will not be removed <br />during final grading. These structures will be retained to provide drainage <br />and sediment control during the period of vegetative reestablishment. Due <br />to their limited size, these structures will not significantly impact the <br />hydrologic balance and will eventually be eliminated through the natural <br />processes of siltation and erosion. <br />The postmining configuration will not differ significantly from the existing <br />topography as illustrated by the South Mine Fan Installation Postmining <br />Topography and Cross-Sections Map, (Map 31-. <br />• Prior to initiation of disturbance, both the existing portal fill material and the <br />supplemental borrow stockpile will be sampled to verify suitability, sampling <br />results will be submitted to the Division, and the best material will be <br />A (2 /nr. • P.O. 8a+ 771018 • S/eambwv SPnnBr. Cob,ndo 80077 • (30379-6760 <br />
The URL can be used to link to this page
Your browser does not support the video tag.