My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95792
DRMS
>
Back File Migration
>
Revision
>
REV95792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:42 AM
Creation date
11/21/2007 11:52:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/19/1992
Doc Name
MR REQUEST 20 SOUTH FAN INSTALLATION
Type & Sequence
MR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Sourllfield Mine Minor Revision Requcsr No. 10 - South Fan Insta!lanon • l1 <br />installation of the fan housing, EFCI may construct block walls, install a <br />culvert structure or steel netting and construct other protective structures <br />at the portal opening. <br />Extend Existing Powerline to the Site <br />When the Monarch No. 4 Mine ceased operations in the 1940's, Southern <br />Colorado Power Company (SCPC) removed the transformers and one <br />section of line. The rest of the transmission line was !eft in-place and can <br />be used as the power supply for the proposed fan installation. EFCI has <br />contacted SCPC and requested that they extend the existing power <br />transmission line to the proposed fan installation. This will involve <br />placement of 3 new line poles, and installation of three transformers, a <br />singte power supply cable and related powerline components. Additional <br />• line poles will not require "raptor-proof" crossarm design since a single <br />shielded power supply cable will be utilized. The additional poles will be <br />located as shown on the South Mine Fan Installation Map, (Map 30). <br />Surface disturbance will be minimized during powerline construction to the <br />extent possible and surface vegetation will be preserved or reestablished <br />through seeding and mulching of disturbance sites. <br />Establish Road Erosion Control and Block Access <br />The powerline access road and the unimproved road located adjacent and <br />to the east of the proposed excess cut material stockpile are existing <br />disturbance features established in conjunction with previous mining <br />operations. EFCI does not anticipate additional disturbance of these roads <br />• but will use the existing powerline road for access to place additional <br />power-poles and extend the existing transmission line as described in the <br />previous section. <br />AQ /n<. • P.O. Bat 771018. 9emnbaar Springs. CobrMn 80177• I303M7~6160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.