My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95792
DRMS
>
Back File Migration
>
Revision
>
REV95792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:42 AM
Creation date
11/21/2007 11:52:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
6/19/1992
Doc Name
MR REQUEST 20 SOUTH FAN INSTALLATION
Type & Sequence
MR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Southfield Mine Minor Revision Request No. 20 -South Fan Installation • /1 <br />Clear and Grade Site and Establish Temporary Stockpile <br />The proposed fan installation will be on the existing portal bench and will <br />utilize the existing foundation structures to the extent possible. Associated <br />earthwork requirements are, therefore, expected to be minimal. EFCI will <br />clear and grade the area immediately adjacent to the portal to facilitate <br />installation of the fan housing and associated equipment. Grading will <br />include removal of any fill material previously placed to limit access to the <br />portals and any material which has sloughed off the adjacent highwall. <br />EFCI estimates a maximum of approximately 200 cubic yards will need to <br />be removed and placed in a temporary stockpile for use in future site <br />reclamation. <br />Site clearing and grading will be accomplished using a wheel loader and/or <br />• tracked dozer and excess material will be hauled to the stockpile by either <br />the loader or arear-dump truck. The proposed stockpile location, covering <br />approximately 0.05 acres, is within the previously disturbed area on the <br />west side of the existing light-use road as shown on the South Mine Fan <br />Installation Map, (Map 30). The stockpile will be a maximum of <br />approximately 5 feet in height, will be constructed in sequential horizontal <br />lifts with sideslopes graded to 3H:1 V, and will be stabilized by seeding with <br />the temporary seed mixture described by Table 33, Proposed Temporary <br />and Permanent Seed Mixtures and Seeding Rates, in the EFCI permit <br />document. <br />Open Fan Portal and Stabilize Surrounding Highwall Areas <br />Once any fill material covering the portal opening is removed, any loose <br />• material around the portal will be excavated. In addition, adjacent highwall <br />areas will be scaled to remove loose rocks or other materials. As <br />appropriate to maintain stability, minimize potential hazards and facilitate <br />~¢ lam. • P.O. Bay TIblB • 9~amboar SprNgr, Cobrodo gNTI • (303~7R626a <br />
The URL can be used to link to this page
Your browser does not support the video tag.