Laserfiche WebLink
<br />Exhibit L - Reclamation Costs <br />Reclamation for the existing permit areas will remain as <br />before, with Phases 5, 6 and 7 being reclaimed in the same <br />manner. Mining of the site will create a rangeland/recreational <br />area of 29.92 acres. It may also create a pond area of about <br />10.04 acres. Reclamation will be done in conjunction with the <br />operation, the following estimates are thus probably somewhat <br />conservative. Reclamation tasks are based on a site with <br />approximately 23 acres of to be reclaimed, excluding the access, <br />other roads and pond. The remainder of the site is to remain <br />undisturbed. The following figures include the reclamation <br />of the existing permit area as well as the new phases. <br />- Grade pit sideslopes with a D-8 dozer. <br />Approx. ±6.7 ac. of shoreline ( includes <br />area below water ) X $750/acre $5025,00 <br />- Replace approx. 4 - <br />inches of topsoil, <br />on 23 ac. ( shores <br />mediately adjacent <br />equipment. <br />Average $00.90 / cu <br />6 ( Ave. 5 inches ) <br />( approx. 14,850 cu yd.) <br />are above water and im- <br />areas ) using appropriate <br />yd. <br />- Seed and seeding. $150/ac X 23 ac. <br />- Ripping/ discing $100/ac X 23 ac. <br />- Fertilize 23 ac. $70/ac <br />- Mulch 1.5 tons per ac., mechanically <br />crimped. $240/ac X 23 ac. <br />- Mobilize/ Demobilize equipment <br />$13365,00 <br />$3450.00 <br />$2300,00 <br />$1610.00 <br />$5520.00 <br />$500.00 <br />TOTAL$31770.00 <br />