Laserfiche WebLink
<br />David Berry <br />October 15, 1990 <br />Page Three <br />Bond Released Acreage (Phase I) - <br />The value of 338 was obtained from the bond release package. The value is not correct, as was <br />discussed with Terrell Johnson during the bond adjustment process. At that time, it was agreed that <br />the value is not correct. <br />Phase I release was granted for all areas of the mine, except the mine office area and the topsoil pile. <br />Therefore, the acreage should equal affected acreage, minus the acreage associated with the mine <br />office and topsoil pile. <br />CYCC Response: <br />Per our previous discussion with the Division, CYCC intends to utilize a value of 368 acres for <br />Phase I Bond Release (Equal to the Reclaimed Acreage value). The application form has been <br />revised accordingly. <br />Bond Release Acreage (Phase III) - <br />The value of 100.2 is reasonable. <br />CYCC Response: <br />No response necessary. <br />MLRD CONCERN: <br />Permanent Roads <br />Please submit a revised post-mining topography map which shows the access roads around and near <br />the Lieske residence as permanent features. <br />CYCC Response: <br />hlap 16A (Reclamation) has been revised to reflect the permanent status of the access roads, <br />and is enclosed. <br />MLRD CONCERN: <br />Drainage Control <br />We will stipulate that a complete technical revision must be provided which thoroughly updates the <br />drainage control plan for the entire site. It must include revised Maps 4a and 4b, which show the <br />total permit area, accurate topographic information, and all drainage control features. The plan must <br />ensure that all disturbed area drainage is handled in accordance with the Rules and Regulations. <br />