My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ -~_ = -Ga-lder <br />L~.SSOClc'1teS <br />August 11, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 33: August 1 through August 7, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of August 1 through <br />August 7, 2004. <br />• The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 48° F to 55° F, and highs ranged from 70° F to 90° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on seven days of this seven-day <br />reporting period (August 1 through August 7, 2004). Poly-Flex conducted Phase Nc construction <br />activities on six days of this seven-day reporting period (August 1 through August 7, 2004). <br />Phase IVc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activifies along the Phase <br />IVb /Phase IVc tie-in area above the LOB. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase IVc OSA, on the east <br />section of the VLF. SLF material was tested, conditioned, reworked, retested, and maintained prior to <br />SLF surface acceptance. <br />Ames continued production of bentonite-amended SLF at the screen plant and pug mill located above <br />• the Ames materials yazd. Ames also continued production of Drain Cover Fill (DCF) material at the <br />Phase Nc 13 August 1-August 7, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.