My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ = = old <br />ASSOC T eS <br />July 27, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & V ictor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 808b0 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 11: July 18 through July 24, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of July 18 through July <br />24, 2004. <br />• The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 45° F to 53° F, and highs ranged from 59° F to 77° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construcfion Ina (Ames) of Aurora, Colorado is the earthworks contractor, for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on six days of this seven-day reporting <br />period (July 19 through July 24, 2004). Poly-Flex conducted Phase Nc constmction activities on five <br />days of this seven-day reporting period (July 19 through July 23, 2004). <br />Phase Nc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase <br />Nb /Phase Nc tie-in azea above the LOB. <br />Ames placed and compacted Soil Liner Fill (SLF) material into the Phase Nc OSA, on the east section <br />of the VLF. SLF material was tested, conditioned, reworked, retested, and maintained prior to SLF <br />surface acceptance. <br />Ames continued excavafion of the Phase Nc OSA geomembrane anchor trench in the northern portion <br />• of Phase Nc on Raven Hill, excavating approximately 150 feet of anchor trench in prepazation for liner <br />Phase Nc 11 June 18-July 24 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.