My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVc Summary No. 10 Page 3 043-2170 <br />• Golder observed placement of HVSC piping in the Phase IVc OSA, verifying installation and layout <br />per the project plans. <br />Laboratory Tests <br />Golder obtained a QC sample ofbentonite-amended soil liner fill (SLF-QC-16) during this reporting <br />period. Laboratory index testing was conducted on the sample of bentonite-amended SLF at the <br />Golder Soils Laboratory in Lakewood, Colorado and at the field trailer to verify suitability of <br />materials prior to use in the field. A summary of QC laboratory test results for SLF materials aze <br />available at the Golder field trailer. <br />Golder obtained two QA samples of soil liner fill (SLFc-QA-10 and SLFc-QA-11) for laboratory <br />index testing. The samples tested met the requirements of the specifications and the results aze <br />presented in Attachment B. <br />Meetin¢s <br />CC&V held a Weekly Contractors' meeting on July 14, 2004. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. The next weekly meeting will be held on <br />July 20, 2004 at 10:00 AM. <br />Golder Personnel On-Site <br />• A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />Ron DiDonato <br />Project Resident <br />I• <br />Phve [Vc to July llJUly V 2006.doc Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.