Laserfiche WebLink
Phase IVc Summary No. 10 Page 2 <br />043-2170 <br />surface acceptance. <br /> <br />• <br />I • <br />Ames continued production of bentonite-amended SLF at the screen plant and pug mill located above <br />the Ames materials yard. Ames also continued limited production of Drain Cover Fill (DCF) material <br />at the screen plant by the secondary crusher. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />Nc OSA. Geomembrane was installed in the Phase Nc OSA on the south facing slope of Raven Hill <br />downward to the Phase Fdb/IVc tie-in. Poly-Flex deployed 80-mil single-sided textured LLDPE <br />geomembrane over an azea of approximately 203,170 square feet in the Phase Nc OSA during this <br />reporting period. Geomembrane panels C-363 through C-425 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion and extrusion seam samples DFc-129 through DFc-151 and DXc-14 <br />through DXc-15 were mazked and removed. Destructive fusion seam peel and shear tests of samples <br />DFc-120, DFc-123 through DFc-125, DFc-127 through DFc-128, DFc-130 through DFc-151, and DXc- <br />14 through DXc-15 were performed and passed per project specification. <br />Ames continued limited placement and grading of DCF material into the Phase Nc OSA in the western <br />and central portion of the VLF, Saddle Fill area. Ames placed DCF material onto approved <br />geomembrane panels and High Volume Solution Collection (HVSC) piping per the project plans. <br />A map of the azea worked during this reporting period is provided in Attachment C. <br />Field Monitorin¢ and Testing Activities <br />Golder observed constmction activities associated with Phase Nc earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed excavation and construction of the SU in Phase Nc for trench dimensions, slope, and <br />materials used. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase Nc OSA for <br />subgrade prepazation, thickness, compaction, moisture-content, and materials used. The Golder CQA <br />earthworks monitor performed fifteen nuclear moisture-density tests (SLNc-102 through SLNc-116) <br />and performed three nucleaz moisture-density retests on SLF that required reworking (SLNc-102a, <br />103a, and 104a) located within the Phase Nc OSA. The retested SLF met the requirements of the <br />specifications. Field test results aze presented in Attachment B. <br />Golder observed geomembrane deployment, documenting ambient temperature, panel dimensions, <br />thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure testing). Geomembrane <br />installed in the Phase Nc OSA met the project specification. <br />Golder visually observed the placement of DCF in the Phase IVc OSA area. Golder CQA monitors <br />(one monitor per dozer when dozers are greater than 50 feet apart) observed DCF placement and <br />verified minimum thickness of 2 feet for fmish grade, and 4 feet for haul traffic (i.e, Caterpillar <br />Mode1740 articulated trucks). <br />PheselVC IOIWy 11-luly l]2004.doc Golder Associates lnc. <br />