My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - _° -Golder <br />~SOC1c'lteS <br />June 15,2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 5: June 6 through June 12, 2004 <br />Cresson Project Phase 1Vc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of June 6 through June <br />12, 2004. <br />• The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 33° F to 53° F, and highs ranged from 58° F to 75° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />i• <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase FVc <br />construction. Ames conducted Phase Nc construction activities on six days of this seven-day reporting <br />period (June 7 through June 12, 2004). Poly-Flex conducted Phase FVc construction activifies on six <br />days of this seven-day reporting period (June 7 through June 12, 2004). <br />Phase IVc <br />Ames continued construction of the Leak Detection Trench (LDT) within Phase IVc along the central <br />section of the VLF from the Saddle Fill. Ames constructed approximately 750 feet of LDT. <br />Ames continued excavation of the Secondary Underdrain (SU) within Phase IVc along the central <br />section of the VLF Raven Hill azea. Ames excavated approximately 200 feet of SU. <br />Ames continued excavation of the OSA geomembrane anchor trench in the western portion of Phase <br />IVc on Chickenhawk Hill, the Saddle FIlI, and Raven Hill, excavating and backfilling approximately <br />500 linear feet of anchor trench for geomembrane deployment activities. <br />Phase IVc OS June 6-June 12 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.