My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Weekly Rpts
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - c =Golder <br />~SOC121.teS <br />• <br />I • <br />June 8, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 4: May 23 through June 5, 2004 <br />Cresson Project Phase IVc Construcfion Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of May 23 through June <br />5, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 25° F to 47° F, and highs ranged from 43° F to 72° F. Weather <br />observations were made on fourteen days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVc <br />construction. Ames conducted Phase IVc construction activities on ten days of this fourteen-day <br />reporting period (May 24 through May 28, and June 1 through June 5, 2004). Poly-Flex conducted <br />Phase IVc construction activities on ten days of this fourteen-day reporting period (May 24 through <br />May 28, and June 1 through June 5, 2004). <br />Phase IVc <br />Ames continued contouring and compaction of subgrade in preparaflon for soil liner fill (SLF) <br />placement in the Phase IVc Ore Storage Area (OSA). Ames spread and placed structural fill (SF) <br />within the Phase Nc area footprint during slope re-contouring. <br />Ames continued construction of the Phase IVc Leak Detection Trench (LDT) within Phase Nc along <br />the central section of the VLF on Saddle FIlI. Ames constructed approximately 680 feet of LDT. <br />Phase IVc 04 May 23-June 5 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.