My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95502
DRMS
>
Back File Migration
>
Revision
>
REV95502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:31 AM
Creation date
11/21/2007 11:50:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Revision
Doc Date
9/15/1982
Doc Name
Interim site plan
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Area 8 (Cut/Fill Slopes Along Road) <br />Area 8a (Cut/Fill Slopes along Road) consists of 45 acres, of which 4 <br />acres will be permanently revegetated during Fall 1982, using topsoil <br />generated during the Dam Access Road construction. The 4 acres have been <br />regraded to approximately a 3:1 slope. The 4 acres were originally associated <br />with the old jeep trail that was abandoned as construction of the permanent <br />road progressed, making these areas available for permanent revegetation. <br />Thirtysix acres make up the permanent Dam Access Road to be completed in <br />1984 to facilitate construction of Middle Fork Dam. At that time the <br />other abandoned sections of the original road will be permanently revegetated. <br />The remaining 5 acres of the 45 are made up of road surface that will be <br />stabilized using dust suppressants as necessary during the 1982 - 1984 <br />• period. <br />Area 8b (Summit Office Site) consists of 6 acres associated with the <br />construction of Middle Fork Dam. The 6 acres will be stabilized using <br />dust suppressants during 1982 and 1983, and be permanently revegetated <br />during 1984 after the site is no longer needed for the Middle Fork Dam <br />construction. The 6 acre site will be regraded and topsoil from the <br />Office Site construction activities will be respread over the site. <br />Area 9 - Davis Gulch Dam Area <br />Area 9 consists of 26 acres, including 22 acres of the Davis Gulch Dam site and <br />adjacent disturbed areas. These 22 acres will remain disturbed until a <br />• decision is made to construct the Davis Gulch Dam or to reclaim the area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.