Laserfiche WebLink
• Area 5b (Test Mine) consists of 25 acres, of which 2 acres are roads to <br />be stabilized using dust suppressants during 1982 - 1984. The other 23 <br />acres are talus slopes and mine waste rock associated with the Pilot Mine <br />that require no further stabilization or revegetation. <br />Area 6 - Mine Bench <br />Area 6a (A-Groove Road) consists of 4 acres of roads that will be stabilized <br />using dust suppressants as necessary during the 1982 - 1984 period. <br />Area 6b (Mine Bench) consists of 52 acres including 25 acres of rock <br />cliffs or mine bench face. No further stabilization or revegetation is <br />planned for these areas. The remaining 27 acres includes the surface of <br />• the mine bench and the crusher pit, for which no additional construction <br />is required during this period. <br />Area 7 (Upper Middle Fork) <br />Area 7 covers 77 acres that are associated with the construction of the <br />Middle Fork Dam. No revegetation work is planned for the 1982 - 1984 <br />period while the dam is under construction. Revegetation will commence <br />in 1985, including the reconstruction of the Middle Fork Stream channel <br />above the pool. (See also discussion in Exhibit G, regarding the effects <br />of constructing a smaller Middle Fork Dam) on water issues. <br /> <br />