My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95502
DRMS
>
Back File Migration
>
Revision
>
REV95502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:31 AM
Creation date
11/21/2007 11:50:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Revision
Doc Date
9/15/1982
Doc Name
Interim site plan
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Area 3 - Valley Access Road <br />Area 3 (Meadows Crossings & Sidehill Section between CR215 and Bebo Bridge) <br />covers 8 acres. Four acres will be permanently revegetated during the <br />fall of 1982 using topsoil stripped from the road construction. The <br />remaining 4 acres make up the Valley Access Road surface that will be <br />stabilized by dust suppressants as necessary during the 1982 - 1984 period. <br />Area 3b (Sidehill Sections from Bebo Bridge to Gate) consists of 27 acres, <br />primarily cut and fill slopes that will be permanently revegetated during <br />the fall of 1982. The remaining 10 acres make up the valley access road <br />surface and will be stabilized by dust suppressants as necessary during <br />the 1982 - 1984 period. <br />• <br />Area 3c (Abandoned South Access to West fork) consists of 7 acres to be <br />permanently revegetated during 1982 using topsoil available from the <br />Valley Access Road construction across Union Meadows. The West Fork of <br />Parachute Creek culvert will be removed after reclamation of Area 3c is <br />complete unless Union Oil Company, the landowner, prefers that the culvert <br />remain. <br />Area 4 - Valley Access Road (on property) <br />Area 4 consists of 17 acres - one acre was temporarily revegetated previously <br />and 7 acres will be permanently revegetated during 1982. Topsoil from <br />• the Valley Access Road construction has been respread to a depth of about <br />six inches on 4 of those 7 acres. The Valley Access Road surface which <br />
The URL can be used to link to this page
Your browser does not support the video tag.