2003-08-05_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-05_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:43:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/5/2003
Doc Name
Weekly Construction Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Phase IVb Weekly Summary No. 27 Page 2 003-2203 <br />Ames uncovered Drain Cover Fill (DCF) and silted in regions of previously installed gemembrane, and <br />at tie-in areas where material had washed in from rainfaIl. <br />Ames backfilled approximately 350 linear feet of Phase fVb OSA anchor trench, south slope of <br />substation hill. <br />Ames hauled, placed, and compacted SLF material onto the Phase IVb OSA slope, south slope of the <br />substation lull area, and south slope of Raven Hill, west of the LOB. SLF material was worked, tested, <br />and passed per project specifications prior to SLF surface acceptance. <br />Ames continued placement of High Volume Solution Collection System (HVSCS) secondary and <br />tertiary piping within the Phase IVb OSA limits, followed by DCF haul and placement per project <br />plans. Ames continued a haul and placement of DCF onto the west and south facing slope of Substation <br />Hill. <br />Ames continued production of DCF at the screen plant located near the Secondary Crusher. Ames also <br />continued limited production of SLF. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />IVb OSA on the west-facing slope of substation hill. Poly-Flex deployed 80-mil single-sided textured <br />LLDPE geomembrane over an azea of approximately 217,186 square feet in the Phase IVb OSA during <br />this reporting period. Geomembrane panels B-511 through B-613 were deployed, seamed, and tested by <br />Poly-Flex. Destructive fusion and extrusion seam samples DFb-152 through DFb-156 and DXb-29 <br />through DXb-34 were marked and removed. Destructive fusion and extrusion seam peel and sheaz tests <br />on 80-mil single sided textured geomembrane deployed during this reporting period passed per project <br />specifications. Destructive peel and shear testing on 80-mil fusion and extrusion samples taken this <br />period passed project specifications. <br />A map of the area worked during this reporting period is provided in Attachment C <br />Phase IVc <br />Ames performed limited cut to stockpile activities in the Phase IVc area during this reporting period. <br />Ames excavated underground working UNK-10 (UG-253) and subsequently backfilled and compacted <br />the area with SF. <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction materials <br />and soil materials placed were verified as suitable, and construction methods were in accordance with <br />project specifications. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase IVb OSA <br />for subgrade preparation, thickness, compaction, moisture content; and materials. The Golder CQA <br />rnaz=~wn.mtYZai~izze, zoo; Golder As50cietes lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.