My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-05_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-05_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:43:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/5/2003
Doc Name
Weekly Construction Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder <br />Associates <br />July 30, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />RE: Summary No. 27: July 20 through July 26, 2003 <br />Cresson Project Phase IVb, c Construcfion Quality Assurance <br />Dear Mr. Roberts, <br />Gi~jsion ~fMinerals and Geolog y <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Constmction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of July 20 <br />through July 26, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 48° F to 57° F, and highs ranged from 78° F to 91° F. Weather <br />observations were made on six days of this seven-day reporting period. <br />Construction Svnorosis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nb <br />construction. Ames conducted Phase IVb construction activities on six days of this seven-day reporting <br />period (July 21 through July 26). Poly-Flex conducted Phase IVb construction activities on six days of <br />this seven-day reporting period (July 21 through July 26}. <br />Phase IVb <br />Ames re-contoured and re-compacted subgrade Structural Fill (SF) in preparation for Soil Liner Fi21 <br />(SLF) placement in the Phase IVb OSA on the south facing slopes of Raven Hill, north of the PSSA. <br />Ames also re-contoured and compacted SF pad III are slope in preparation of Bedding Fill (BF} <br />placement and compaction efforts. <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-22C~E <br />CE~VE® <br />AUG 0 5 ?003 <br />Ames excavated and removed ore material from the southwest access haul road into the PSSA. Ames <br />then exposed approximately l00 linear feet of geomembrane liner at the Phase IVb /Ore pad slope in <br />preparation of BF placement and subsequent 100-mil smooth liner deployment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.