My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94671
DRMS
>
Back File Migration
>
Revision
>
REV94671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:01 AM
Creation date
11/21/2007 11:42:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
8/10/2001
Doc Name
COST SUMMARY FORM
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimatinc,;LSoftware <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado PermiUjob# : M-1977-227 <br />Date : 08/10/2007 County :Castilla Abbreviation :none <br />User: JD1 Site:MesitaHillPit Filename:M227-005 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation <br />Task description :shape disiur6ed area <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D7R - 7SU Horsepower : 230 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shitt basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cast Breakdown : Ownership cost/hour : $37.39 NA <br /> OperatingcosUhour : $49.44 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosUhour : $114.82 Total fleet cosUhour : $114.82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 23,554 LCY factor : NA volume : 23,554 LCY <br />Source of estimated volume :Operator <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 410.8 LCY/hr Dozing method : 7.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (tshitt/day) <br />Loose stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 0.99 (Cat HB) <br />Average push gradient : 1.00 % (pas) Altitude : 0.88 (Cat HB) <br />Average site altitude : 7,750 feet Material weight : 1.00 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,300 Ibs/LCY Net correction : 0.78 <br />Weight description <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 320.47 LCY/hr <br /> Adjusted fleet production : 320.47 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) Total job time : 73.50 Hours <br />Unit cost : $0.358 /LCY Total job cost : $8,439 <br />
The URL can be used to link to this page
Your browser does not support the video tag.