My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94671
DRMS
>
Back File Migration
>
Revision
>
REV94671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:01 AM
Creation date
11/21/2007 11:42:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
8/10/2001
Doc Name
COST SUMMARY FORM
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 08/10/2001 <br />User: JD7 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation <br />Task description :shape miscellaneous areas <br />HOURLY EQUIPMENT COST <br />Basic machine :Ca[ D7R - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachmentno.2:NA <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 17,988 <br />State :Colorado <br />County : Costilla <br />Site :Mesita Hill Pit <br /> Utilization <br />Ownership cosUhour : $37.39 NA <br />OperatingcosUhour : $49.44 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $114.82 Total fleet cosVhour <br />PermiVob# : M-1977-227 <br />Abbreviation :none <br />Filename : M227-006 <br />Horsepower: 230 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Swell Loose <br />CCY factor : NA volume : 17,988 LCY <br />Source of estimated volume :Op. <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : i00 feet <br />Unadjusted hourly production : 714.3 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 1.00 % (neg) <br />Average site aRitude : 7, 750 Feet <br />Material weight : 2,300 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0. i99 /LCY <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />1.20 <br />1.20 <br />1.00 <br />0.83 <br />1.00 <br />1.02 <br />0.88 <br />1.00 <br />1.00 <br />0.81 <br />C1 id A9 <br />Source <br />(Cat <br />(Cat HB) <br />576.07 LCY/hr <br />576.07 LGY/hr <br />Total job time : 31.23 Hours <br />Total job cost : $3,585 <br />
The URL can be used to link to this page
Your browser does not support the video tag.