My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94671
DRMS
>
Back File Migration
>
Revision
>
REV94671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:01 AM
Creation date
11/21/2007 11:42:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
8/10/2001
Doc Name
COST SUMMARY FORM
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 08/10/2001 <br />User: JD1 <br />CIRCES Cost Estimating)_Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Costilla <br />Site :Mesita Hill Pit <br />Agency or organization name :OMG <br />Permit or other job action :Final Reclamation <br />Task description :Push fines and fill into <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R - 7SU Horsepower : 230 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $37.39 NA <br />Operatingcost/hour : $49.44 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $114.82 Total fleet cosVhour: $114.82 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 59,693 LCY factor: NA volume: 59,693 LCY <br />Source of estimated volume :Operator <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 200 Teel <br />Unadjusted hourly production : 410.8 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 2.00 % (negJ <br />Average site altitude : 7,750 feet <br />Material weight : 2,000 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.295 /LCY Total job cost <br />Permit/job# : M-1977-227 <br />Abbreviation :none <br />Filename : M227-004 <br />0.75 <br />1.20 <br />1.20 <br />1.00 <br />0.83 <br />1.00 <br />1.05 <br />0.88 <br />1.15 <br />1.00 <br />0.95 <br />Source <br />HB) <br />389.77 LCYlhr <br />389.77 LCY/hr <br />153.15 Hours <br />$17,585 <br />
The URL can be used to link to this page
Your browser does not support the video tag.