My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94505
DRMS
>
Back File Migration
>
Revision
>
REV94505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:55 AM
Creation date
11/21/2007 11:40:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
5/24/1999
Doc Name
DRAFT WEST PIT EVAPORATION POND SYSTEM DESIGN SAN LUIS PROJECT COSTILLA CNTY CO
Type & Sequence
TR26
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Costs <br />Costs associated with construction, operation, and maintenance aze anticipated to be minimal and <br />will most likely be on the order of $325,000 for construction and $5,000 - $7,000 per month for <br />operation and maintenance. Mechanical maintenance will be required for the pumps, pump <br />lines, valves, flow meters, and sprayers. In addition periodic inspection of the liner and <br />diversion channel for environmental degradation will be require and will be performed by site <br />personnel. <br /> <br /> <br />Bartle ,Nounlain Resources, /nc. DR1 Fh Shepherd Mdler, lnc. <br />p~if00:6 %~ewq parxLlrepxc~dx 5-2 May 21. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.