My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94113
DRMS
>
Back File Migration
>
Revision
>
REV94113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:42 AM
Creation date
11/21/2007 11:38:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
7/9/2001
Doc Name
FAX COVER
From
BMRI
To
DMG
Type & Sequence
TR31
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-09-2001 07:34 AM 2644 17193790713 <br />• • <br />DMRI 'I'R-31 Responses <br />July 2, 2UU1 <br />Page 2 <br />Response: HMRI will initiate quarterly monitoring and reporting of the tailings <br />facility undcrdratn water quality for WAD and total cyanide, copper, sloe, iron, <br />~L calcium and sodium initiating third quarter 2001(.luly through September). This <br />(~ yuarterly monitoring report will be due to the Division on or bcforc the fifteenth <br />day of the month following the end of each quarterly period (i.e., October IS'h, <br />January 1S~h, April 15'h, and Junc 1,5'"). <br />CDMG Comment 3: <br />'The tailings pond water will be tested monthly for arsenic pursuant to the requirements nt' <br />TR-2ti. <br />,r , Response: HMRI will continue the monthly arsenic testing and reporting~ta <br />p Division pursuant to TR-26 for the tailings pond water. <br />CDMG Comment 4: <br />DMRI's proposal to use compliance reyuiretnents approved in Tl>;-15 for the t8ilings <br />impoundment 1'OC is acceptable and hereby approved. As a reminder of'TR-IS protocol, <br />if one or both cyanide constiluettts in the quarterly sample exceed the permit cPndition <br />value a verification sample will be collected and analysed within two weeks. If the first <br />verification sample also exceeds permit conditions, a second verification sample will be <br />collected and analyzed. If ell three samples execed permit conditions the Division may <br />notice DMRI of a possible violation of that condition of the permit and BMRI will be <br />required to submit a Response flan addressing rite issue within 30-days. [f either <br />verification sample is within the permit condition values, sampling reverts back to <br />yuarterly monitoring. BMRI must notify the Division within five (5) working days aticr <br />receiving the: lab reports of the quarterly sample ii' WAD and/or total cyanide levels <br />exceed 3.8 mg/I and/or 4.=1 mg/I respeclivcly. <br />Response: DM121 agrees with the Division's identification of the provisions required <br />with the TR•1S POC protocol and agrees to comply Frith these conditions/pr~n•isions <br />'b for the tailings impoundment PQ(''. <br />CDMG Comment ~: <br />P. 03 <br />The Division will concede eliminating bulb L)W-3 and 87-24 monitoring wells from <br />monitoring requirements since they arc not points of compliance but will requite <br />retaining nt least one upgradient alluvial aquifer monitoring well (either M-16 or M-30). <br />
The URL can be used to link to this page
Your browser does not support the video tag.