My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93285
DRMS
>
Back File Migration
>
Revision
>
REV93285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:37 AM
Creation date
11/21/2007 11:29:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977053
IBM Index Class Name
Revision
Doc Date
9/26/1996
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STATE OF COLORADO <br />Roy Romer, Gwemor <br />Patti Shwaydtt, Acting Executive Director <br />Dedicated to paecting and improving the health and environment of the peopk o/ Cobrado <br />4300 Cherry Creek Dr. 5. Laboratory Building <br />Denver, Colorado 80222-1530 4210 E. 11th Avenue <br />Phone (303) 692-2000 Uenvtt, Colarade 8D2243716 <br />(3031691 X700 <br />January 24, 1996 <br />Todd Stockebrand, Secretary <br />Asphalt Constructors, Inc. <br />P.O. Box 449 <br />Alamosa, CO 81101 <br />RE: Permit Applicationi No. 95CS970F <br />Dear Mr. Stockebrand: <br />~R~1• <br />Colorado Dtpartnlent <br />of Public Hnlrb <br />and Fnvironmrnt <br />Your application has been received by the Division and a <br />preliminary analysis has been made. It has been determined that no <br />emission permit will be required for the above referenced source as <br />the production rate will be 70,000 tons per year or less. An Air <br />Pollutant Emission Notice is required, however, as uncontrolled <br />emissions of particulate matter less than 10 microns (PMto) will be <br />more than 2 tons per year. <br />This exemption from permit requirements is issued in reliance upon <br />the accuracy and completeness of information supplied by the <br />applicant and is conditioned upon construction, installation, and <br />operation in accordance with this information and with <br />representations made by the applicant or the applicant's agents. <br />Specifically, this exemption has been granted provided that the <br />following information is accurate and complete: <br />1. The production rate does not exceed 70,000 tons per year. <br />Annual records of the actual production rate shall be <br />maintained and made available to the Division for inspection <br />upon request. <br />2. Visible emissions shall not exceed 20$ opacity. <br />3. There shall be no transport of visible emissions off-site. <br />4. The applicant shall follow the control plan as submitted with <br />the application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.