My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02271.0 RIP RAP <br />PART 1: GENERAL <br />• 1.01 DESCRIPTION: <br />All work shall be tamed out in compliance with these SPECIFICATIONS and in conformance with the <br />lines, grades and dimensions as shown on the DRAWINGS. <br />1.02 RELATED SECTIONS: <br />Refer to the following Sections for related work: <br />Secfion 02200.0 Earthworks <br />Section 03300.0 Cast-in-place Concrete <br />PART 2: SPECIFICATIONS AND INSTALLATION <br />2.01 MATERIAL SPECIFICATIONS <br />A. Rip mp shall consist of hazd, dense, durable stone, angulaz in shape and resistant to weathering. <br />Rounded stone or boulders will not be accepted as rip rap material. The stone shall have a <br />specific gravity of at least 2.5. Each piece shall have its greatest dimension not greater than three <br />times its least dimension. If approved by CERTIFYING ENGINEER, removed concrete may <br />be used for rip rap provided it meets the other requirements of this section. <br />B. Material used for rip mp will be approved by CERTIFYING ENGINEER it; by visual <br />inspection, the rock is detemtined to be sound and durable. MANAGER and CERTIFYING <br />ENGINEER may require CONTRACTOR to famish laboratory results to verify that the <br />• material meets SPECIFICATIONS. At the request of MANAGER, CONTRACTOR shall <br />furnish laboratory test results indicating that the material meets the requirements for strength as <br />indicated in the following table. <br />' Test Description sTestMethod' ' <, Speci6cafitin Requiremenk <br />Point Load Tensile Strength 300 psi (min) <br />C. Rip rap shall conform to the gradation requirements given in the following table: <br />Notes: <br />1) dso =average stone size <br />2) based on typical rock weight <br />3) equivalent spherical diameter <br />4) based on a specific graviTy of 2.5 <br />D. Nominal stone size and total thickness of the rip rap shall be as shown on the DRAWINGS. <br />Secton 02271 Page 1 of 2 Mazch 22, 2000 <br />Rip Rap Golder Associates Revision 2 <br />I~OOJOBSM3-21]OWC CERTIFJCATION REPOR'NF41SE NC OSA C1A'MPPENDICIESNPPENDIXE TECFINICAL SPECIFICATIONS~]1R2.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.