Laserfiche WebLink
2.02 INSTALLATION: <br />• Stones with typical stone dimensions that aze equal to d~ and larger shall be placed at the top surface with <br />faces and shapes matched to minhnize voids and form as smooth a surface as practical. Dumping and <br />backhoe placement alone is not sufficient to ensure a properly interlocked system. The material may be <br />machine-placed to form a substantial bond as approved by MANAGER and CERTIFYING <br />ENGINEER. <br />*** END OF SECTION *** <br />C J <br />I • <br />Secrion 02271 Page 2 of 2 Mazch 22, 2000 <br />Rip Rap Golder Associates Revision 2 <br />JMA410BS1043-21]W VC CERTfFICAiION REPORTPHASE NC OSA CERTAPPENDICffS41PPENDLY E iECHMCAL SPECIF[CA'I[ONSD22]IR2DOC <br />