Laserfiche WebLink
3.04 BLASTING <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted surface is <br />• below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted surface using a <br />method specification approved by the CERTIFYING ENGINEER, and then remediate according to the <br />DRAWINGS to achieve the design grades and elevations. If the blasted surface is above the Soil Liner <br />subgrade elevation, the CERTIFYING ENGINEER assess the foundation conditions and recommend <br />whether the CONTRACTOR shall overexcavate and backfill with Cemented Rockfill and Structural Fill, <br />or if the CONTRACTOR shall remove excess material and compact the fmal grade surface using a <br />method specification approved by the CERTIFYING ENGINEER. <br />*** END OF SECTION *** <br />• <br />• <br />Section 02210 Page 3 of 3 Mazch 22, 2000 <br />Underground Working Remediafion Golder Associates Revision 1 <br />I b410BS~00J-211U~[VC CERTIF[CAiION REPOR'MHASE NC OSA CER7NPPENDICIESAPPENDIX E'IECEiMCAL SPECR]CAr[ONSA2210RIDOG <br />