My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® conswction of access roads, drainage control features and erosion control features to <br />verify compliance with the DRAWINGS and SPECIFICATIONS. <br />• <br />6.02.02 PLACEMENT OF MATERIALS: <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented Rockfill, <br />Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Sail Liner Fill, <br />Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granulaz Filter Material, the CQA <br />Monitor shall: <br />® verify the use of appropriate fills; <br />® monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to <br />attain compaction, including number of passes, uniformity of compaction coverage, <br />compacted lift thickness, bonding of lifts and in-place moisture content and dry density is <br />in compliance with the SPECIFICATIONS; <br />® monitor Soil Liner Fill surface preparation to verify that the surface has been proof-rolled, <br />compacted, or handworked so as to be in a condition suitable for geomembrane <br />installation as discussed in Section 02200 of the SPECIFICATIONS; <br />® monitor Bedding Fill placement and surface prepazation to verify that the surface is <br />suitable for geomembrane installation as discussed in Section 02200 of the <br />SPECIFICATIONS; <br />• <br />® monitor the placement of fill to ensure that CONTRACTOR exercises care in the <br />vicinity of pipes and that the underlying geosynthetics aze not damaged; <br />® monitor and document CONTRACTOR verification of in-place Soil Liner Fill, Bedding <br />Fill, Low Volume Solution Collection Fill and Drain Cover Fill thickness; <br />® monitor equipment being used to place Low Volume Solution Collection Fill and Drain <br />Cover Fill to verify that the CONTRACTOR places the material in accordance with the <br />SPECIFICATIONS; <br />® monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill <br />for azeas in which the slope exceeds 4H:1V and that the dozer does not perform <br />unacceptable pivot turns; and <br />®monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />• <br />Section 01400.1 <br />Earthworks CQA Plan <br />/:\04IOHSSO4]-2170\IVC CERrffI( <br />Page 6 of 10 March 22, 2000 <br />Golder Associates Revision 5 <br />;ER741PPENDICH35WPPENDIX E IECIiMCAL SPECIFICAiIONS\014001R5 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.