Laserfiche WebLink
TCC response (Wastewater Treatment Ponds) <br />Attached, please find the site plan for the wastewater ponds. Unfortunately, I was <br />unable to locate cross sections, but they can be prepared from the plan. <br />Division response ,Wastewater Treatment Ponds) <br />No site plan map was received by the Division. The original issue as outlined in the <br />midterm still stands. <br />Pond E Lsh Creek Tipple) <br />Adequate design information presently exists in the Foidel Creek mine permit. Certification <br />which specifically references this design is required. <br />TCC response (Fish Creek Tipple) <br />The survey has been completed and TCC is awaiting drawings from (sic) for use is <br />preparing the certification. In the interim the design information presented in the <br />Fish Creek Tipple appendix can be used to obtain pertinent sediment control <br />information. <br />Division res~nse Lish Creek Tipple) <br />The original request for proper certification still stands. Also, the Division had no <br />issues with regard to the design and is somewhat confused by the response to this <br />question. <br />EMD dewateringponds <br />Design information for this facility is good and the ponds are not constructed at this time. <br />The Division reminds TCC to submit an as-built certification as per the Policy <br />Memorandum after completion of this facility and prior to it's use. <br />TCC response (EMD dewateringpon~] <br />No response necessary. <br />Division response {EMD dewaterin~ponds) <br />Response accepted. <br />