Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 02/15/2002 <br />User : RCO <br />State : Co/orado <br />County :Gunnison <br />Site : Rozman Pit <br />PermiVjob# : M-1981-014 <br />Abbreviation :none <br />Filename : M014-005 <br />Agency or organization name : DMG <br />Permit or otherjob action :Bond review <br />Task description :Spread topsoil evenly across pit floor <br /> <br /> ~ ~~ ~~ ~ ~ ~~ ~ ~ <br />HOURLY EQUIPMENT COST ~ ~ -" <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Uti lization <br />Cost Breakdown : Ownership cosUhour : $54.31 NA <br /> Operating cosUhour : $95.93 100 <br /> Ripper op. cosUhour: $0.00 0 <br /> Operator cost/hour: $27.99 NA <br /> <br />, _ ~..~ <br />t = Total unit cosUhour : <br />_ <br />_ ~.,_. $178.22 <br />_____ Total <br />~ fleet cost hour : $178.22 <br />. _ _ _ w <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 18,822 CCY factor: 1.125 volume: 21,175 LCY <br />Source of estimated volume : 35 ac floorx 4"depth, phases /A-IB <br />Source of estimated swell factor : n/a <br />----~_ -- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % Q <br />Average site altitude : 8,900 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production :_ <br />Adjusted fleet production <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.00 <br />0.95 <br />0.90 <br />1.00 <br />0.37 <br />464.02 <br />464.02 <br />HB) <br />LCY/hr <br />LCY/hr <br />Fleet size : 1 Dozers) Total job time : 45.83 Hours <br />Unit cost: $0.384 /LCY Totaljobcost: $8,133 <br />_.._... __...~~._....,.__..J <br />