Laserfiche WebLink
<br />MPROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />SCRAPER-ONLY WORK <br />Agency or organization name :OMG <br />Task # : 004 State : Coloratlo Permitlob # : M-1981-014 <br />pate : 02/152002 County : GunNSOn Abbreviation :none <br />User : RCO Site : Rozman Pit Filename : M014004 <br />Permit or olherjob action :8ontl n=.view <br />Task description :Haul topsoil from stockpi/e to pit floor <br /> <br />HOURLY EQUIPMENT COST <br />Model :Cat 623E Shift basis : 1 per day <br />Cost Breakdown : Job utilization We Horsepower 365 <br />Ownership cosUhour: 850.47 NA <br />Operating cosUhour: $91.56 100 Weight (UST) : 38.92 <br />Operator cosUhour: 826.18 NA Cost data source : (CRGJ <br />Total unit cosUhouf : $170.22 Total Heel cosU(tour . $340.43 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 21,175 LCV factor: NA volume : 21,176 LCY <br />Source o(quantity take-o9: 35 ac x 4"depth, piled avg. 1000 away <br />Source of estimated swell factor : NA ' <br />.. .:'. <br />HOURLY PRODUCTION <br />Haul'na Caoac N <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight: 2,550 pounds/LCY Struck volume: 18.00 LCV <br />Material description : Heaped volume : 23.00 LCY <br />Earth-Dry packed Average volume: 20.50 LCY <br />Rated payload: 55,200 pounds <br />Payload capacity: 21.65 LCY Adjusted capacity: 20.50 LCV "` <br />Cvcle TimeO ad+haul+ mead+retuml~ <br />Travel lime'. <br />Route ~ Distance (feel) ~ Grade (q) ~ Roll. <br />Loading time : 0.90 <br />Maneuver and spreading time : 0.70 <br />loading time per pair on push-pull models <br />Total res.(%) ~ Velocity ((pm) ~ Travel time <br />Return :~ 1,000 ~ -10.0 i 5.0 ~ -5.0 ~ 2,640 i 0.59 ~minWes^ <br />•• [ravel time edjustetl for acmleration and deceleration a[ loatl and tlump points <br />Job Condition Correction Factors <br />Site altitude (feet) : 8,900 <br />Altitude adjustment factor: 0.87 <br />Job efficiency (actor'. 0.83 <br />Net job correction factor : 0.72 <br />Total cycle time <br />Adjusted Houdv Production <br />4.86 <br />minutes <br />minutes <br />minutes <br />Unadjusted unit production : 253.09 ICY/Hour''' <br />Adjusted unit production : 182.75 LCY/Hour <br />Adjusted Peet production : 355.51 LCYMour <br />2 times volume on Dash-Dolt models <br />JOB TIME AND COST :. _v __, __, _. _~..-.._..~_...,. ~_._..~_~_._~~_.,„_...... _.__~ <br />Fleet size : 2 Scraper(s) Total job time : 57,93 Hours <br />Unit cost: $0.931 /LCY Totaljob cost: $19,722 <br />