My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-15_REVISION - M1981014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981014
>
2002-02-15_REVISION - M1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:45 AM
Creation date
11/21/2007 11:17:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Revision
Doc Date
2/15/2002
Doc Name
Notice of Bond Increase
From
DMG
To
Valco Gunnison Concrete Division
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 02/15/2002 <br />User <br />RCO <br />State : Co/orado <br />County :Gunnison <br />Site : Rozman Pit <br /> <br />PermiUjob # : M-1981.014 <br />Abbreviation :none <br />Filename : M014-006 <br />Agency or organization name : DMG <br />Permit or other job action :Bond review <br />Task description :Rip compaction on pit floor, loads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $54.31 NA <br />Dozer operating cosUhour : $95.93 100 <br />Ripper operatingcosUhour: $9.42 100 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $187.64 Total fleet cost/hour : $187.64 <br />j - -_....~ .._.__. ......~_ ._. ;-~ <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 35.00 acres Rip depth (ft) : 1.00 <br />Bank volume : NA <br />Volume : 56,467 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :approved phased plan <br />Source of estimated load factor : NA 1 <br />L.~- ~...-_... _.~~~..__.,,~__.~~ _... ) <br />HOURLY PRODUCTION - <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozerspeed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />JOB TIME AND COST <br />NA feeUsecond <br />NA cu. yds./hour <br />Unadjusted production <br />per selected method <br />1,436.70 cu. yds./hour <br />1.00 feeUpass Site altitude : 8,900 feet <br />7.67 feeUpass Altitude adjustment : 0.95 (Cat HB) <br />500.00 feeUpass Job efficiency factor : 0.83 (1 shifUday) <br />88.00 feeUminute Net job correction : 0.79 multiplier <br />0.25 minutes/pass <br />0.891 acres/hour Adjusted unit production : 1,132.84 cu. yds./hour <br />1,436.70 cu. yds./hour Adjusted fleet production : 1,132.84 cu. yds./hour <br /> <br />Fleet size : 1 dozers) Total job time : 49.85 hours <br />Unit cost : $0.166 per cu. yd. Total job cost : $9,353 <br />
The URL can be used to link to this page
Your browser does not support the video tag.