My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92062
DRMS
>
Back File Migration
>
Revision
>
REV92062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:32 AM
Creation date
11/21/2007 11:17:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/17/1999
Doc Name
BOWIE 2 MINE PR3 DOWNHILL CONVEYOR & PRODUCTION INCREASE PN C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie No. 2 Mine <br />C-96-083 <br />Permit Revision 03 <br />J1tS 27Sept99 <br />Task 053 <br /> <br />Site Maintenance Over the Ten-Year Liability Period <br />A. Repair Rills and Gullies: Assume Shours/year with a CAT D3C Dozer <br />CAT D3C Cost = $46.83/hour <br />80 hours x $46.83/hour = $3,746.40 <br />B. Maintain Roads and Ditches: Assume 8hours/2years with a CAT 12G Grader <br />CAT 12G Grader Cost = $56.98/hour <br />40 hours x $56.98/hour = $2,279.20 <br />C. Pond Cleaning: Assume the three ponds will need to be cleaned three times each <br />over the ten-year liability period. Cost to dredge a pond, including mobilization <br />costs is $10,000/pond/cleaning. Equipment includes a CAT E 120B excavator, <br />three haul trucks and one CAT D3C dozer. <br />3 ponds x 3 cleanings x $10,000.00/pond/cleaning = 390,000.00 <br />Total Cost for Task 053 $96,025.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.