My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92062
DRMS
>
Back File Migration
>
Revision
>
REV92062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:32 AM
Creation date
11/21/2007 11:17:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/17/1999
Doc Name
BOWIE 2 MINE PR3 DOWNHILL CONVEYOR & PRODUCTION INCREASE PN C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie No. 2 Kline <br />C-96-083 <br />Permit Revision 03 <br />JRS 27Sept99 <br />Task 0_>4 $725.00 <br />Proctor'I'esting of Backfill <br />Assume 5 tests required (Operator estimate) <br />Assume each test is S 145.00 (Operator estimate) <br />Total = 5x$145.00 = $725.00 <br />Task 055 $99,718.29 <br />Nuclear Density Testing of Backfill <br />The Operator provided an estimate from WESTEC of $63.00/ftour. This includes <br />a technician, transportation, equipment and lab work. The technici:ut is required <br />for all of the backfillin~ work. <br />Total Backfilling Hours = 1582.83 <br />Total = hours x $63.00/hour = $99,718.29 <br />Task 056 $90,950.51 <br />Cost due to compactor idle time <br />Backfilling hrs 1582.83 - 669.03 Compactor hrs = 913.8 Compactor idle hours <br />Compactor cost = 599.53/hour <br />Total = 913.8 hours x 599.53/hour = 590,950.51 <br />Task 057 $958.88 <br />Cost to reopen road to Drill Hole 38 (DH-38) <br />Assume 8 hours of CAT D8N time @ l 19.86/hour <br />Total = 3 hours x S l 19.36/hour = 5958.33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.