My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92062
DRMS
>
Back File Migration
>
Revision
>
REV92062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:32 AM
Creation date
11/21/2007 11:17:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/17/1999
Doc Name
BOWIE 2 MINE PR3 DOWNHILL CONVEYOR & PRODUCTION INCREASE PN C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RCADARLE EQUIPMENT; <br />Machine Description <br />Total Eqp. <br />Cast/hr <br /> <br />Fleet Size Naul trip Re+:urn Trip <br />(no. hauled) Cost/hr (:ost/hr <br />sheet Z of 2 <br />Subtotals E0.00 E0.00 <br />X08/O~EXOF1 SUPPORT EQUIPMENT: --------- ..-_______ <br />-----•---------------------- 4eight Ownership Haul Rig Fleet Size Haul Trip Return Trip DO7 Permit <br />Non-Foadable Eqp. Description (tans) Cost/hr Cost/hr (na. hauled) Cosc/hr Cost/hr Cost/ea <br />Subtotals 50.00 50.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals E0.00 E0.00 <br />EQUIPMENT XAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Grarnd Junction <br />Tota( one way travel distance = 120.0 <br />______ miles. Average travel speed = <br />___ 45.00 mph. <br />__________ <br />Jot Time - Non Roadable Equip.= 1.00 hours load Roadable Equip.= N/A hours load <br />2.67 hours haul ~Z.67 hours haul <br />1.00 hours unload N/A hours unload <br />2.67 hours return 2.57 hours return <br />JOEF CO57 <br />Total Meb/Demob Cos; = E30,3'8.67 <br />NOfE: Nan-roatlable equipment (haul rig required [o transport) mob/demob costs 6asec an 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-uay empcy~return. Roadable ea:i,rmenc (no haul rig required) <br />costs based on one round trip. Corrado OOT requires special permits For cver;i xe equi pmenc on certain <br />specified road segments wi chin the s:a:e. Separate permi :s are required Fcr each rig on each loaded [rip. <br />ACdi ci ovally, piLOC cars (one or two =er rig Cepentling on degree of oversize) are also required for oversize <br />equipment hauling, and loadi rg/unlcaeieg r.mes mu S. he inc reazed subs :an r.a..y 'or equipment which mus: to <br />partially dismantleC For [ranspor: are re~a;semcl 2d a: :hr job ii;'. G;a 'or lifting equipment ant ocner <br />wpcort ecuipmenc needed for :hi; ._-2 snc~lc Le inc;_C2C it ;r,2 .TGt: /'.2mCC ]-a .e, <br />
The URL can be used to link to this page
Your browser does not support the video tag.