Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOUfPMENT MOBILI2ATi0N / DEMOBILIZATION <br />Task k... 051 Prep. by JRS filename..C083-051 <br />_ <br />_ <br />____________ <br />O ate..... 27•sep-99 <br />Perini[ M ____ <br />__ __________ <br />C-96.083 Nine......Bowie No. 2 Mine <br />Permit Action........ Permit Revision 03 <br />Task Description..... Mobilize/Demobilize Equipment for Pond Removal <br />________________________________________________________________________ <br />____________ <br />__________ <br />HOURLY EOU[PMENT COST <br />_____________________ NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tracc ar 6x4, 75,000 lb GVw, 375 HP, diesel powered <br />-L[. Trailer ; 25 can folding gooseneck, drop deck <br />-Med. Trailer : 50 ton folding gooseneck, drop deck <br />-HVy. Trailer : 120 Ton folding gooseneck, drop deck <br />-Pilot Car : On-highway light duty truck, 4x2, 130 hp, 1/2 tan rating, gasol ine powered <br />-Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 con capacity, 125 hp, 70 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 XP, diesel powered <br />-Flatbed Truck: 30,000 lb GW, 210 NP, di eset powered <br />Last UPdace: ---_°___-__'___________________'-__---___-_-_'--___--___'--_-_ _'---___-_-- '--__-___' <br />August, 1997 (trucks) <br />--------------------- L[. Rig Med.Rig Xvy.Rig Pilot Hydraulic Fuel Cube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 i. Car Crane Truck Truck Truck <br />___________P ________ <br />Ownershi Cost/hr _________ <br />525.59 ________________________________________________________________ <br />E28.10 531.38 51.73 524.12 56.88 ____________ <br />512.66 __________ <br />57.88 <br />Operating Cosc/hr = 528.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />Operator Cost/hr = 522.61 E22.61 522.61 E21.82 523.13 522.35 521.24 E22.35 <br />Helper Cost/hr = E21.82 E21.82 521.82 50.00 E0.00 E0.00 E0.00 50.00 <br />Total = 598.40 5102.70 5108.15 528.37 578.73 548.80 559.46 542.05 <br />NON-ROADABIE EOUTPNENT <br />________~-__~-____- neigh[ Ownership Naul Rig flee[ Size Haul Trip Return Trip DOT Perini[ <br />Machine Description (tons) Cost/hr Cosc/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />==..=vz====s==.==c=v.s-_--z==v.==c=.=ve. e=ce=eve==c e..==c_=v=s_ ___-____c===coe.==c=ecv==== vse=v=====e=...ec====av.e= <br />CAT D8N Dozer 40.82 EL1.10 5102.70 1 5143.80 5102.70 50.00 <br />CAT 637E Scraper 60.12 573.93 St08.15 t 5182.08 5708.15 50.00 <br />R evegetati on Equipment 20.00 560.00 598.40 7 5158.40 f98.40 50.00 <br />=s=v. ..==v==.=aa=vn.v==v=c.==n.=== =..v==v.a==.==va.a======n..==v...==.v=n.....z==en:====v===v ____________________ <br />Subtotals 5-?=.29 5509.25 50.00 <br />