Laserfiche WebLink
<br />D. REBCREENING/CLABBIFYING <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of rescreening per day _ <br />Proposed controls (sae above) <br />_ tons. <br />_ tons. <br />hours. <br />VII. CONVEYORB/TRANBFER POINTB No Modification <br />A. <br />Tons of material conveyed per year tons. <br />Tons of material conveyed per day tons. <br />Proposed controls <br />Controls for conveyors include: Full enclosure, partial enclosure, no <br />control, other (specify) <br />(INDICATE ON A SEPARATS DIAGRAM SOIf CONVEYOR BYSTEM IS SST IIP) <br />H. TRANSFER POINTS <br />Number of transfer points <br />Proposed controls <br />Controls for transfer points include: Full enclosure, partial <br />enclosure, water sprays, chemical suppressants, no controls, other <br />(specify) <br />6 <br />