Laserfiche WebLink
<br /> <br />D. LOADING OIIT FROM RAW MATERIAL 6TOCRPILE: Not Applicable <br />Method of loading out (front-end loader, conveyor, etc.) <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specify) <br />VI. PROCESSING Not Applicable <br />will processing (i.e., crushing, screening, etc.) occur on site? <br />^ Yes ^ No (check oae) <br />NOTE: ALL PROCESS SQOIPMENT REQIIZREB A SEPARATE PERMIT APPLICATION AND <br />ADEN (BSPARATS FORK I8 ATTACHED AT END OF TH8 FORK - BARE ADDITIONAL <br />COPIES A8 NEEDED). <br />Material loaded into processing equipment by: <br />Conveyor Front end loader Other <br />CONTROLS FOR PROCESSING INCLQDE: Moist or wet materials (specify <br />moisture ~ if known), water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment must alrea3p be permitted. <br />IST ROCE88 NO CONTROLS IN THE APPROPRIATE SPACES BELOW <br />A. PRIMARY CRIIBHZNG <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day _ <br />Proposed controls (aee above) <br />B. SCREENING/CLASSIFYING <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of screening per day _ <br />Proposed controls (see above)_ <br />C. SECONDARY CRASHING <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day <br />Proposed controls (see above) <br />tons. <br />_ tons. <br />hours. <br />tons. <br />_ tons. <br />hours. <br />tons. <br />_ tons. <br />hours. <br />5 <br />