My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91968
DRMS
>
Back File Migration
>
Revision
>
REV91968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:27 AM
Creation date
11/21/2007 11:16:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
4/22/1996
Doc Name
REQUEST FOR APPROVAL OF EMISSION PERMIT MODIFICATION EMISSION PN 12 FR370F-2 SOUTHFIELD MINE
From
ENERGY FUELS COAL INC
To
CDOH
Type & Sequence
MR31
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VIII. FINIBHED PRODOCT <br />A. LOADING INTO FINIBHED PRODQCT BTOCKPILE No Modification <br />Method of loading in (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls <br />Controls for loading to stockpile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />B. FINIBHED PRODDCT BTOCKPILE <br />Maximum tons stored at one time llo,ooo tons. <br />Length of time pile remains undisturbed one week <br />Proposed controls: (check appropriate bozos) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (applied according to manufacturer's <br />specifications). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check one) <br />^ Revegetation, (length of time till revegetation ) <br />^ Other (specify) <br />© No control <br />C. LOADING OQT FROM STOCKPILE FOR FINAL TRANSPORT No Modification <br />Method of loading out (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls <br />Controls for loading out of stockpile include water injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br />T <br />
The URL can be used to link to this page
Your browser does not support the video tag.