Laserfiche WebLink
<br />VIII. FINIBHED PRODOCT <br />A. LOADING INTO FINIBHED PRODQCT BTOCKPILE No Modification <br />Method of loading in (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls <br />Controls for loading to stockpile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />B. FINIBHED PRODDCT BTOCKPILE <br />Maximum tons stored at one time llo,ooo tons. <br />Length of time pile remains undisturbed one week <br />Proposed controls: (check appropriate bozos) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (applied according to manufacturer's <br />specifications). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check one) <br />^ Revegetation, (length of time till revegetation ) <br />^ Other (specify) <br />© No control <br />C. LOADING OQT FROM STOCKPILE FOR FINAL TRANSPORT No Modification <br />Method of loading out (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls <br />Controls for loading out of stockpile include water injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br />T <br />