Laserfiche WebLink
• <br />IX. VEHICLE HAIIL ROADS Not Applicable <br />CONTROL OPTIONS FOR VESICLE HAIIL ROADS <br />(DO NOT WRITE IN THIS SECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to manufacturer's specifications) <br />specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by (date). <br />4. Gravel <br />(LIST SAIIL ROAD CONTROLS IN TSE APPROPRIATB SPACSS HBLOW) <br />A. TRANSPORT OF_RAA_NATERIAL FROM REMOVAL BITE TO STOCKPILE <br />Distance (one way) Not Applicable <br />If stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity No. of wheels <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day <br />Haul road silt content (if known) $. <br />List controls for raw materials transport: (see measures liateQ above) <br />Proposed controls <br />e <br />