Laserfiche WebLink
I. FIVE CROSS-SECTIONAL SURVEYS OF THE STREAM <br />RELOCATION, TO BE AGREED UPON BY THE DIVISION <br />PRIOR TO THE SURVEY. <br />2. A LONGITUDINAL PROFILE OF THE STREAM BED FROM 50 <br />FEET ABOVE THE BRIDGE CROSSING THE PURGATOIRE <br />RIVER, EXTENDING TO 100 FEET BELOW THE STREAM <br />RELOCATION SECTION. <br />3. A MONUMENT TO BE PLACED ON THE NORTH BANK OF <br />THE RELOCATED PURGATOIRE RIVER IN THE STRAIGHT <br />PORTION OF THE CHANNEL RELOCATION FOR THE <br />PURPOSE OF MEASURING BANK MOVEMENT. THIS <br />MONUMENT MUST BE PLACED IN AN AREA WHERE NO <br />FUTURE DISTURBANCE WILL OCCUR. <br />Stioulation No. 9A. <br />THE PERMITTEE WILL CONTINUE TO MONITOR THE SPRINGS NUMBERED 12 <br />THRU 20 IN AUGUST OF EACH YEAR AND SUBMIT AN ASSESSMENT OF THE <br />SIGNIFICANCE OF THE SPRINGS AND SEEPS ON SURFACE FLOWS, IRRIGATION <br />PRACTICES, LIVESTOCK WATERING, WILDLIFE WATERING, AND DOMESTIC <br />USE. THIS INFORMATION WILL BE SUBMITTED WITH THE ANNUAL <br />HYDROLOGIC REPORT. <br />Stipulation No. 14 <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER CIRUELA CANYON AND <br />APACHE CANYON DRAINAGES, THE PERMITTEE MUST COLLECT DATA ON THE <br />QUANTITY OF WATER FLOWING IN THESE DRAINAGES. MONITORING MUST <br />BE SUFFICIENT TO DIFFERENTIATE SEASONAL FLOW VARIATIONS. <br />PRIOR TO SECONDARY OR RETREAT MINING UNDER PETE CANYON, THE <br />PERMITTEE SHALL PROVIDE A DESCRIPTION OF STREAM FLOW <br />CHARACTERISTICS AND WATER USE IN PETE CANYON. <br />THE PERMITTEE SHALL PROVIDE AN ASSESSMENT OF THE PROBABLE <br />HYDROLOGIC CONSEQUENCES OF SECONDARY OR RETREAT MINING ON THE <br />QUANTITY AND QUALITY OF SURFACE WATER IN CIRUELA, APACHE AND <br />PETE CANYONS. <br />-5- <br />