My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91831
DRMS
>
Back File Migration
>
Revision
>
REV91831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:20 AM
Creation date
11/21/2007 11:15:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
4/2/1997
Doc Name
MID TERM PERMIT REVIEW NEW ELK MINE BASIN RESOURCES INC C-81-012
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section III <br />Status of Stipulations <br />The stipulation history for this site is difficult to follow due to the re-use of stipulation numbers <br />throughout the life of this site. Stipulations are a binding part of the permit and previously <br />assigned stipulation numbers are not to be re-used. However, it appears that procedure was not <br />followed in this case. Investigation of the stipulation response file, revisions to the permit, and <br />the findings documents indicate the following stipulations are still active, as shown below. It is <br />assumed that other stipulations issued over the life of this operation have been complied with or <br />terminated after review of various Files and documents maintained for this permit. <br />Both of the stipulations listed below were issued as a result of the Permit Renewal dated January <br />25, 1994. As indicated, both of these stipulations have been satisfied and are no longer active. <br />Stipulation Brief Description Status Comments <br />STIP NO. 52 HYDROLOGIC COMPLIED WITH <br /> IMPACTS 3/7/94 <br />STIP NO. 53 TOPSOIL & COMPLIED WITH SEE TR-37 <br /> REVEG 4/21/94 <br />The active Stipulations to the permit at the time of this mid-term review, which originated from <br />previous permitting, are as follows: <br />Stipulation No. 2(461 <br />IMMEDIATELY FOLLOWING STREAM CHANNEL RELOCATION <br />CONSTRUCTION AND BEFORE REROUTING THE PURGATOIItE BACK INTO <br />ITS PERMANENT BANKS, THE PERMITTEE MUST COMPLETE A SURVEY <br />OF THE NEWLY CONSTRUCTED CHANNEL. THE COMPONENTS OF THE <br />SURVEY ARE DETAILED BELOW. <br />EACH FOLLOWING YEAR, DURING THE MONTH OF FEBRUARY <br />(COINCIDING WITH LOW-FLOW), THE PERMITTEE MUST RESURVEY ALL <br />OF THE FOLLOWING REQUIRED COMPONENTS OF THE CHANNEL AND <br />SUBMIT THIS INFORMATION TO THE DIVISION BY MAY 1ST OF EACH <br />YEAR. <br />~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.